14:01 28 Dec 24
Info Report Check
Submission incomplete:
The DOE is requested to explain how the determination of the grid emission factors under the PoA is in line with “Tool to calculate the emission factor for an electricity system” (version 07.0), in particular:
(a) With paragraph 99, which requires that steps to determine the CO2 emission factor for an electricity system shall be applied to each CPA, while the grid emission factors (EFgrid,OM,y, EFgrid,BM,y and EFgrid,CM) are set fixed ex-ante at PoA level;
(b) How the wOM and wBM are set at 0.25 and 0.75 is appropriate for CPAs that will be included during the second PoA renewal period. It is to be noted that the wOM and wBM is linked to crediting period, instead of PoA renewal period;
(c) With paragraphs 100 and 101, as the PoA-DD does not describe, inter alia, the equations and options used to calculate the emission factor, and the choice of which option to use.
Refer to paragraph 382(b) of VVS-PoA.
The DOE is requested to explain how the determination of the grid emission factors under the PoA is in line with “Tool to calculate the emission factor for an electricity system” (version 07.0), in particular:
(a) With paragraph 99, which requires that steps to determine the CO2 emission factor for an electricity system shall be applied to each CPA, while the grid emission factors (EFgrid,OM,y, EFgrid,BM,y and EFgrid,CM) are set fixed ex-ante at PoA level;
(b) How the wOM and wBM are set at 0.25 and 0.75 is appropriate for CPAs that will be included during the second PoA renewal period. It is to be noted that the wOM and wBM is linked to crediting period, instead of PoA renewal period;
(c) With paragraphs 100 and 101, as the PoA-DD does not describe, inter alia, the equations and options used to calculate the emission factor, and the choice of which option to use.
Refer to paragraph 382(b) of VVS-PoA.
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: