Submission incomplete:
1: The PoA-DD (Section A.3, footnotes 8-13) indicate that the implemented measures will also include other concept(s)/technology(ies). The DOE shall provide information on how it has assessed compliance of this statement with paragraph 33 (e) of the PS-PoA ver. 02 which requires the CME to provide a description, in the CDM PoA, of the technologies/measures to be employed and/or implemented by the CPAs under the PoA.


2: The validation report (Section D 2.1) has concluded that the demonstration of additionality, emission reduction calculations and monitoring are the same for wind, solar, wave and tidal projects and thus one Generic CPA-DD (i.e. Generic CPA 1) is presented for all four types of projects. It is observed (PoA-DD, footnote 8) that on-shore and off-shore wind power plants will be implemented. However, Tool32 is not applicable for demonstrating additionality related to on-shore wind projects. The DOE shall provide additional information to justify combination of wind (on-shore and off-shore), solar, wave and tidal projects under Generic CPA 1 to comply with the requirement under paragraph 58 of ACM0002 ver. 20.


3: The PoA-DD (Sections A.1 and H.3s) indicate that the included CPAs will consist of the installation of Greenfield power plants considering Large-scale or Small-scale CPAs. The DOE shall clarify how it has assessed the applicability of ACM0002, applicable to this PoA, to small-scale CPAs considering that the eligibility criteria (Sections K) has not addressed the small-scale conditions related to CPA inclusion criteria under paragraph 124 (v), m & n of the PS-PoA ver. 02.