Submission incomplete:
1: The DOE is requested to provide a clear diagram of the project activity, replacing “Figure 1: Schematic of the project including meters” on page 6 of the MR with a higher quality image, since some of the labels are unreadable.


2: The DOE is requested to provide the relevant information related to the calculations of the ex-post OM value for the Kenyan electricity for years 2017, 2018, 2019 and 2020. This shall include corresponding data vintage, source of the electricity generation, and details of the OM calculations referenced as “Grid emission factor calculation spreadsheet for the years 2017, 2018, 2019 and 2020” in the VCR (page 14, footnote 21). The OM calculations shall be presented in a traceable form on the spreadsheet.


3: The PP/DOE are requested to provide the details of the amount of electricity sold to each of the four tea factories and to the grid for years 2017, 2018, 2019 and 2020 considering that the MR and the VCR provide the total amount of electricity generated by the project activity per year. In doing so, the calculations of emissions reductions in the spreadsheet need to reflect the breakdown of the electricity supplied and the DOE should provide a verification opinion of such data and information.