Info Report Check
Submission incomplete:
Scope: The verification report does not state that the monitoring has been carried out in accordance with registered or the accepted revised monitoring plan. (VVS v2 para 235)
Issue: The DOE is requested to further substantiate how the monitoring has been in accordance with the registered monitoring plan and the approved methodology, as the registered monitoring plan and methodology require to calculate the energy savings using the metered energy consumption data obtained, however neither the monitoring report nor the spreadsheet calculates the energy savings.