Info Report Check
Submission incomplete:

1. There is an inconsistency in the cross-referencing of the ER amount. The submission page refers to 23,544 whereas the ER spreadsheet, monitoring report, verification and certification report and issuance request for refer to 21,862.
2. The submitted post-registration changes request form version 8 is no longer valid. Please use form version 9.
3. There is an inconsistency in the sign-off dates. The validation report form for post-registration changes version 2 dated 21/05/2021 is dated prior to the completion date of the PDD and monitoring report.
4. There is an inconsistency in the cross-referencing of the PDD version. The validation report form for post-registration changes on page 4 and the verification/certification report on page 24 refer to PDD version 2.5 dated 14/04/2021 whereas the applicable PDD is version 2.6 dated 03/03/2022.
5. There is an inconsistency in the cross-referencing of the VVS version. The validation report form for post-registration changes on page 5 refers to VVS version 2, which is no longer valid.
6. The format of the monitoring report has been altered. The numbering of Section E is inconsistent. The section “calculation of project emissions or actual net removals” and section E.7 is missing.