Info Report Check
Submission incomplete:
1: Scope: The verification report does not state that the monitoring plan is in accordance with the applied methodology. (VVM v.1.2 para 200, 203 & 221(d))
Issue: The methodology requires the calculating of the energy savings due to the equipment installed. However, this parameter is not present in the Monitoring plan and Monitoring Report.

2: Scope: The verification report does not provide a conclusion on the verified amount of emission reductions achieved and/or determine that calculations of baseline emissions, project emissions and leakage as appropriate have been carried out in accordance with the formulae and methods described in the monitoring plan and the applied methodology document. (VVM v.1.2 para 208 (c) & 221 (h))
Issue: With regard to the comparison between the actual and estimated emission reductions, it is not clear how the DOE concluded that the nature of the deposit during this monitoring period was different with one considered in the registered PDD, as the DOE has not provided any comparison between both.