Info Report Check
Submission incomplete:
1: Scope: The verification report does not provide an assessment that all physical features of the proposed CDM project activity proposed in the registered PDD are in place and/or that the project participant has implemented and operated the proposed CDM project activity as per the registered PDD or the approved revised PDD. (VVM v.1.2 para 196)
Issue:It is not clear whether the power generated by the project activity is supplied to the grid or for captive use given that page 31 of the verification report indicates that the power generated is for captive use (the electricity generated is supplied to the manufacturing facility of the corporation), not exporting to the grid, which is not consistent with the project description in the registered PDD (the net electricity generated will be exported to the grid).

2: Scope: The verification report does not state that the monitoring has been carried out in accordance with registered or the accepted revised monitoring plan. (VVM v.1.2 para 206 & 221(d))
Issue: it is not clear how each monitoring parameter in the monitoring plan of the registered PDD has been monitored by the three meters (M1, M2, M3).