16:19 30 Jan 25
Info Report Check
Submission incomplete:
Scope: The verification report does not indicate that the information provided in the monitoring report has been cross-checked with other sources such as plant log books, inventories, purchase records, laboratory analyses. (VVM v.1.2 para 208 (a) and (b))
Issue: The DOE is requested to provide information i) on the exact correlation between the dry hydrological conditions and the higher dispatch of diesel and coal power plants justifying the 14% increase in operating margin emission factor, EFOM, and ii) regarding the capacity additions for the year 2010 to justify the 92% increase in the build margin emission factor, EFBM
Scope: The verification report does not indicate that the information provided in the monitoring report has been cross-checked with other sources such as plant log books, inventories, purchase records, laboratory analyses. (VVM v.1.2 para 208 (a) and (b))
Issue: The DOE is requested to provide information i) on the exact correlation between the dry hydrological conditions and the higher dispatch of diesel and coal power plants justifying the 14% increase in operating margin emission factor, EFOM, and ii) regarding the capacity additions for the year 2010 to justify the 92% increase in the build margin emission factor, EFBM
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: