Info Report Check
Submission incomplete:
Scope: The validation opinion does not contain a confirmation that the changes do not require prior approval of the Board and the provisions of Appendix 1 of Project Standard apply to those corrections
Issue: The verification report (page A-6) verifies that the project is fully commissioned and operational since 30/09/2010. The project activity has been registered on 04/01/2012, with the validating DOE confirmed the locations of the project via checking the commissioning certificate and land sale deeds (page 13 of the validation report refers). However, information regarding why corrections in WEGs locations are needed has not been provided. In particular, the DOE has not confirmed whether the WEGs requested for corrections are the same WEGs validated during request for registration of the CDM project activity. Please refer to paragraphs 303 and 304 of the VVS version 7.