19:04 05 Jul 25
Info Report Check
Submission incomplete:
1: VVS-PA Para 258 and Para 360:
For Akal site, Mokhla site and Gangavansara site, page 15 of the monitoring report (shows one main meter and one backup meter for each of these sites which indicate that there is one transmission line connected to these meters for each of these sites. However, single line diagrams on pages 16 and 17, show two transmission lines for each of the sites with each line having one meter. The DOE is requested to: (a) clarify the number of meters installed and transmission lines for each of these sites; (b) provide the single line diagrams in the monitoring report which reflect all the transmission lines and installed meters; (c) provide information of all the meters, including the calibration, as required by paragraph 260 (b) of PS-PA, version 03.0.
2: VVS-PA Para 373 (b):
As shown in the ER spreadsheet, for Karnataka, Net export values calculated from the JMR records is used for calculation of the emission reductions. However, it is observed that invoice values are lower than the net export values based on JMR report. The DOE is therefore requested to explain how it verified parameter EG facility,y (Quantity of net electricity generation supplied by the project plant/unit) for each site in light of the invoice values being lower than the JMR values.
1: VVS-PA Para 258 and Para 360:
For Akal site, Mokhla site and Gangavansara site, page 15 of the monitoring report (shows one main meter and one backup meter for each of these sites which indicate that there is one transmission line connected to these meters for each of these sites. However, single line diagrams on pages 16 and 17, show two transmission lines for each of the sites with each line having one meter. The DOE is requested to: (a) clarify the number of meters installed and transmission lines for each of these sites; (b) provide the single line diagrams in the monitoring report which reflect all the transmission lines and installed meters; (c) provide information of all the meters, including the calibration, as required by paragraph 260 (b) of PS-PA, version 03.0.
2: VVS-PA Para 373 (b):
As shown in the ER spreadsheet, for Karnataka, Net export values calculated from the JMR records is used for calculation of the emission reductions. However, it is observed that invoice values are lower than the net export values based on JMR report. The DOE is therefore requested to explain how it verified parameter EG facility,y (Quantity of net electricity generation supplied by the project plant/unit) for each site in light of the invoice values being lower than the JMR values.
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: