Submission incomplete:
1: Scope: The monitoring report does not contain information on calibration of monitoring instruments (frequency, relevant dates of calibration and/or validity) as specified by the monitoring methodology and the monitoring plan. (EB48 - Annex 68 paragraph 10 (a) (iv) & EB 54 Annex 34)
Issue 1: The calibration dates for NDIRs are not fully reported in the monitoring report. It is requested to report all the calibration dates which cover whole monitoring period.
Issue 2: The date of last calibration of NDIR instrument No. AI-061 is reported as February 28, 2010 which is not consistent with the date in the verification report (February 28, 2011.) It is requested to provide consistent information.
2: Scope: The verification report does not provide an assessment on whether the calibration of measuring equipments was conducted at a frequency specified in applied monitoring methodology or EB guidance if applicable, and/or the monitoring plan? (VVM v.1.2 para 184 (a) (ii) & EB 52 Annex 60)
Issue 1:The calibration dates for NDIRs are not fully reported in the verification report. It is requested to report all the calibration dates which cover whole monitoring period.
Issue 2: It is reported that a calibration (QAL2 test) was performed every 10 days for NDIR 10-AT-062. However, it is reported that QAL2 test was performed only on 7 February 2008. It is requred to provide consistent information.
1: Scope: The monitoring report does not contain information on calibration of monitoring instruments (frequency, relevant dates of calibration and/or validity) as specified by the monitoring methodology and the monitoring plan. (EB48 - Annex 68 paragraph 10 (a) (iv) & EB 54 Annex 34)
Issue 1: The calibration dates for NDIRs are not fully reported in the monitoring report. It is requested to report all the calibration dates which cover whole monitoring period.
Issue 2: The date of last calibration of NDIR instrument No. AI-061 is reported as February 28, 2010 which is not consistent with the date in the verification report (February 28, 2011.) It is requested to provide consistent information.
2: Scope: The verification report does not provide an assessment on whether the calibration of measuring equipments was conducted at a frequency specified in applied monitoring methodology or EB guidance if applicable, and/or the monitoring plan? (VVM v.1.2 para 184 (a) (ii) & EB 52 Annex 60)
Issue 1:The calibration dates for NDIRs are not fully reported in the verification report. It is requested to report all the calibration dates which cover whole monitoring period.
Issue 2: It is reported that a calibration (QAL2 test) was performed every 10 days for NDIR 10-AT-062. However, it is reported that QAL2 test was performed only on 7 February 2008. It is requred to provide consistent information.