Submission incomplete:
1: Scope: The monitoring report does not contain reference to the deviation requested by PP/DOE and approved by the Executive Board for the monitoring period in consideration, prior to submitting request for issuance. (EB48 - Annex 68 paragraph 10 (a) vi & EB 54 Annex 34)
Issue: the request for deviation I-DEV-0499 was applied for this monitoring period, but not indicated in the monitoring report.
2: Scope: The spreadsheet does not contain explanation with regard to application of formulae in the spreadsheet. (EB48 - Annex 68 paragraph 10 (b) (iii)).
Issue: The spreadsheet does not indicate how the compliance with the manufacturer's specifications of the flare were met in order to adopt the default value of flare efficiency during a certain hour (as required by the tool, the parameter "Other flare operational parameters" must be monitored when adopting the default value of flare efficiency).
1: Scope: The monitoring report does not contain reference to the deviation requested by PP/DOE and approved by the Executive Board for the monitoring period in consideration, prior to submitting request for issuance. (EB48 - Annex 68 paragraph 10 (a) vi & EB 54 Annex 34)
Issue: the request for deviation I-DEV-0499 was applied for this monitoring period, but not indicated in the monitoring report.
2: Scope: The spreadsheet does not contain explanation with regard to application of formulae in the spreadsheet. (EB48 - Annex 68 paragraph 10 (b) (iii)).
Issue: The spreadsheet does not indicate how the compliance with the manufacturer's specifications of the flare were met in order to adopt the default value of flare efficiency during a certain hour (as required by the tool, the parameter "Other flare operational parameters" must be monitored when adopting the default value of flare efficiency).