Info Report Check
Submission incomplete:
Scope: The verification report does not state that the monitoring has been carried out in accordance with registered or the accepted revised monitoring plan. (VVM v.1.2 para 206 & 221(d))
Issue: The monitoring plan (p 39) states that “The generated power from WTGs (63 Nos x 800kW, total 50.4MW) will be measured at 33kV bays…Metering system for the project activity consists of one main and one check meter. Both the meters are two-way trivector meters capable of recording import and export of electricity and provide output in the form of net electricity supplied to the grid.” However, the monitoring report and the verification report indicate that 1) the meter of feeder 4 at 33kV is connected not only to project activity but also to 9 WEGs of non-project activity and 2) the electricity import and export by the project connected to feeder 4 was calculated based on meters at the controller of the WTGs which were not included in the monitoring plan. Further clarification is required by the DOE on how it verified that the monitoring was done in line with the registered monitoring plan.