Info Report Check
Submission incomplete:
1:
The DOE (p 8) states that "As per the CDM project standard for project activities (Ver.1.0), for the “Permanent changes from the registered monitoring plan”, if the changes to the monitoring of the registered CDM
project activity is related to the one(s) listed below which do not require prior approval by the Board: (a) Change of calibration frequency or practice for monitoring equipment not within the control of project participants or the coordinating/managing entity; (b) Change of accuracy/type/model of meter(s) as per a power purchase agreement (PPA); or (c) Change of location of meter(s) as per a PPA; (d) Change of location of electricity meters if the transmission loss is taken into account; (e) Change of location of substation not within the control of the project participants or the coordinating/managing entity; (f) Change of calibration frequency or practice for monitoring equipment as per the applied methodology or national standard; or (g) Change of frequency of monitoring certain parameters as per the applied methodology." However, the paragraphs referred by the DOE in the validation opinion is not in the CDM PS for PA version 1 but in the CDM project standard version 9 which is not valid.

2:
The verification report does not include any information related to the verification of global stakeholder consultation required to be conducted by the project participant for the first monitoring period in accordance with para 184 of the CDM project cycle procedure version 01. Refer to para. 394 of CDM VVS for PA version 01.