07:52 04 Jan 25
Info Report Check
Submission incomplete:
Further clairification is required on how the DOE, in line with the VVS for project activity v03 para 303, validated the proposed changes to supply electricity to captive use against the applicability and application of the applied methodology AMS. I. D. v17.
Project displaces captive fossil fuel electricity generation at the user end is contained in the project design change in the request for PRC (issuance track). However, supplying to captive use is not applicable to the methodology AMS. I.D v17 (refer to table 2 in the methodology).
Further clairification is required on how the DOE, in line with the VVS for project activity v03 para 303, validated the proposed changes to supply electricity to captive use against the applicability and application of the applied methodology AMS. I. D. v17.
Project displaces captive fossil fuel electricity generation at the user end is contained in the project design change in the request for PRC (issuance track). However, supplying to captive use is not applicable to the methodology AMS. I.D v17 (refer to table 2 in the methodology).
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: