12:43 20 Aug 26
Info Report Check
Submission incomplete:
1: Scope: The verification report does not state that the monitoring plan is in accordance with the applied methodology. (VVM v.1.2 para 200, 203 & 221(d))
Issue: The DOE validated that the monitoring plan is in accordance with version 3 of ACM0009 (available version at the time of registration); however, version 3.2 was already available at the time of verification. Please note that according to the EB guidelines, the latest editorial version of the methodology should be used for the request for issuance.
2: Scope: The certification report does not indicate the monitoring period under verification and/or the corresponding number of CERs requested by the DOE. (EB48 Annex 68 para 10 (d))
Issue: There are two different monitoring periods presented in the certification report. The DOE is requested to correct the moniotring period under consideration in the certification report in line with the requirement of EB48, Annex 68 para 10(d).
1: Scope: The verification report does not state that the monitoring plan is in accordance with the applied methodology. (VVM v.1.2 para 200, 203 & 221(d))
Issue: The DOE validated that the monitoring plan is in accordance with version 3 of ACM0009 (available version at the time of registration); however, version 3.2 was already available at the time of verification. Please note that according to the EB guidelines, the latest editorial version of the methodology should be used for the request for issuance.
2: Scope: The certification report does not indicate the monitoring period under verification and/or the corresponding number of CERs requested by the DOE. (EB48 Annex 68 para 10 (d))
Issue: There are two different monitoring periods presented in the certification report. The DOE is requested to correct the moniotring period under consideration in the certification report in line with the requirement of EB48, Annex 68 para 10(d).

Offset now: visit the United Nations Carbon Offset Platform
Connect with us: