Info Report Check
Submission incomplete:
1:
The monitoring report on page 3 mentions rated power capacity of turbine as 2,400 KWh, whereas PDD specifies that the project activity has plate power capacity of 2.3MW. The DOE shall provide information how it verifies that the project is implemented in accordance with the PDD. Ref: para 320 CDM validation and verification standard for project activities version 1.0

2:
The verification report mentions that calibration for the energy meters were conducted on 29th May 2007 and 30th April 2016. The DOE mentions that neither the methodology nor the PDD specify frequency for calibration of meters. However, paragraph 76 (c) of the CDM project standard for project activities , version1.0 requires that measuring equipment shall be calibrated in accordance with the international standard if there is no local standard or manufacturer specification. The DOE shall provide more information how it verifies that PP complies with the requirement of paragraph 76 (c) of the CDM project standard for project activities , version1.0.