Info Report Check
Submission incomplete:
1: The spreadsheet (“Error”) shows that 0.2% was applied to the readings of ICE meter from 1 September 2016 to 31 March 2017. The verification report states that “Based on calibration certificates checked a delay in calibration has been identified for the following period: ICE main meter: Start date of delay: 01/09/2016; End date of delay: 31/03/2017.” The DOE is required to provide further information on how it verified the application considering that 1) the appendix 6 of the verification report states indicates that the ICE meter were calibrated in 2011 and 2) the verification report identified two delayed periods of 01/01/2013-31/05/2014 and 01/03/2016-31/03/2017 for CNFL main meters.”


2: The DOE raised CAR02 regarding the difference between measured electricity values between the ICE and CNFL meters during the month of August 2016 and closed it by stating that "It is confirmed that ICE main meter is working properly (with an error below 0.2%) so the application of the maximum permissible error of the meter (0.2%) is in line with per VVS version 1 EB93 §§368-374". The DOE is required to provide further information on how it verified the difference of more than 5 % during March 2014 between measured electricity values between the ICE and CNFL meters.