Submission incomplete:
Scope: The verification report does not provide an assessment that all physical features of the proposed CDM project activity proposed in the registered PDD are in place and/or that the project participant has implemented and operated the proposed CDM project activity as per the registered PDD or the approved revised PDD. (VVM v.1.2 para 196)
Issue:The DOE shall explain how it has verified that the installed capacity of the project activity is 50MW given that each power unit of the project activity was generating electricity at a capacity more than 25MW over 270 days within a year. In doing so, please also: (i) specify the actual capacity of the steam turbine and generator verified; and (ii) explain how the DOE has verified that the power plant is able to operate over capacity for over 270 days within a year.
Scope: The verification report does not provide an assessment that all physical features of the proposed CDM project activity proposed in the registered PDD are in place and/or that the project participant has implemented and operated the proposed CDM project activity as per the registered PDD or the approved revised PDD. (VVM v.1.2 para 196)
Issue:The DOE shall explain how it has verified that the installed capacity of the project activity is 50MW given that each power unit of the project activity was generating electricity at a capacity more than 25MW over 270 days within a year. In doing so, please also: (i) specify the actual capacity of the steam turbine and generator verified; and (ii) explain how the DOE has verified that the power plant is able to operate over capacity for over 270 days within a year.

Offset now: visit the United Nations Carbon Offset Platform
Connect with us: