01:15 17 May 24
Info Report Check
Submission incomplete:
Further information is required by the DOE on how it conducted the verification as the verification report (p10) states that no site visit was carried out while the DOE reported (verification report p. 12, 14, 17, 19) that i) Project Implementation/operation, ii) Monitoring parameters (Monitored data and monitoring instruments), iii) Management and Operation System and iv) Assessment of CAR #01 were verified based/during the site visit. (Please refer to VVS ver 7, section 9.4),
Further information is required by the DOE on how it conducted the verification as the verification report (p10) states that no site visit was carried out while the DOE reported (verification report p. 12, 14, 17, 19) that i) Project Implementation/operation, ii) Monitoring parameters (Monitored data and monitoring instruments), iii) Management and Operation System and iv) Assessment of CAR #01 were verified based/during the site visit. (Please refer to VVS ver 7, section 9.4),
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: