Info Report Check
Submission incomplete:
Scope: The validation report does not contain information on how the DOE validated that the changes from the registered monitoring plan are in accordance with paragraphs 4 and 5 of the Appendix 1 of Project Standard which do not require prior approval of the Board as per VVS version 09.0 paragraphs 289 and 312.
Issue:
The DOE shall provide information on how it is ensured that the electricity meters are reliable and calibrated considering that the proposed revision of monitoring plan specifies that the project owner has no right to calibrate the meter VIITangcun which is used to measure the “exported electricity” and “imported electricity".