Info Report Check
Submission incomplete:
Scope: The submitted spreadsheet is not in an assessable unprotected format .
Issue: The secretariat concluded that the request submission is incomplete after the DOE/PP failed to provide an unprotected calculation spreadsheet "Accounting eligible HFC-23 Dongyang MP17" within the specified two (2) days of the receipt of the request. please refer to PCP v 2.0 para 189.