Info Report Check
Submission incomplete:
1: Scope: The monitoring report does not contain the values of the monitored parameters. (EB 54 Annex 34)
Issue: The Monitoring Plan (page 3) requires the monitoring of the SO2 consumption for each equipment k in each segment j per year. However, the monitoring report (page 18) refers to “Excel spreadsheet “RIMA_ SO2 consumption 2010-Jul to 2011 Feb” for consumption per equipment”, which has not been submitted in the request for issuance documentation.

2: Scope: The monitoring report does not contain information on calibration of monitoring instruments (frequency, relevant dates of calibration and/or validity) as specified by the monitoring methodology and the monitoring plan. (EB48 - Annex 68 paragraph 10 (a) (iv) & EB 54 Annex 34)
Issue: Monitoring Plan (page 13) states that “Most of the scales and flowrates have a 6 months period for new calibrations”. However, the PP did not report the calibration frequencies of the SO2 flow meters.