Info Report Check
Submission incomplete:
1: Scope: The verification and certification report does not provide an assessment on whether the calibration of measuring equipments was conducted at a frequency specified by the applied methodology, the standardized baseline and/or the monitoring plan as per VVS version 09.0 paragraph 400.
Issue: The verification and certification report has now reported the delayed calibrations. However, it has not reported how the provision in paragraph 395 of the VVS version 09.0 has been complied with in the absence of the information about the error identified in the delayed calibration test.

2: Scope: The verification and certification report does not provide a conclusion on the verified amount of emission reductions achieved nor/or confirm that appropriate methods and formulae for calculating baseline emissions, project emissions and leakage have been followed as per VVS version 09.0 paragraphs 403 (c) and 409 (j).
Issue: The verification and certification report has provided the calculation which resulted in the 1.06% of the transmission loss. However it has not provided information about the figures used in the calculation, i.e. 318.663, 333.036, 1320000, 3, and 125 MW, and how the DOE verified the correctness of the figures.