Submission incomplete:
Scope: The monitoring report does not contain a description of the monitoring systems, quality assurance and/or quality control system employed by the project activity, data collection procedures (information flow including data generation, aggregation, recording, calculation and reporting), organizational structure, roles and responsibilities of personnel, emergency procedures for the monitoring system, and/or line diagrams showing all relevant monitoring points). as per PS version 09.0 paragraph 246.
Issue: The registered PDD (pg. 28) indicates that the metering system consists of three sets of electronic bidirectional tri-vector meters (Yard Meters (individual WEG site), Check Meter and Main Meter). The submitted MR (pg. 5) indicates the metering system comprises three sets (Main meter, check meter and stand-by-meter). The VR (pg. 21) has verified that the project WECs were commissioned in seven phases and each phase WECs are connected to a set of energy meters (main, check and stand-by meters). The PP/DOE are requested to clearly identify the total number (sets) of meters installed under the project activity in the metering diagram. In doing so, please ensure consistency of the metering system between the registered PDD and the submitted MR.