Info Report Check
Submission incomplete:
1:
The DOE (p 7) states that "Under section A.2 of the PRC PDD, geo-coordinates of each WTGs are provided and same are found correct." The DOE is required to provide further information on how it validated the correctness of newly incorporated geo-coordinates of each WTGs in the revised PDD since there was no evidence/information on how it validated.
2:
The DOE states that "justification of non-calibration of WTG controller found appropriate and same was confirmed with service provider during verification remote audit & interviews for PRC validation." The DOE is required to provide further information on how it validated the calibration of WTG controller since there no evidence on checking it with the manufacturer.
3:
Both the monitoring report (section B.2) and the verification report states that there was no PRC. However, the PRC was submitted along with this request for issuance. The PP/DOE is required to update the monitoring report and the verification report.
4:
The PP shall provide the monitoring line diagram (graphical scheme) showing all relevant monitoring points (including the controller data indicated in the submitted emission reduction spreadsheet) as per the PS-PA ver. 03 paragraph 258 taking into account that the verification report (Section E.6.2) indicates that the parameter “Quantity of net electricity generation supplied by the project plant/unit” is measured based on certificate of share.
5:
The DOE (p 15) states that "The net electricity generated by the project activity is taken directly from the joint metering report (JMR) issued by state utility on monthly basis." The DOE is required to provide its verification on the emission reduction spreadsheet (“Apportioning”) as per the revised PDD submitted along with the request for issuance.
6:
The DOE states that "The management of Clean Wind Power (Devgarh) Private Limited is responsible for the preparation of the GHG emissions data and the reported GHG emissions reductions on the basis set out within the project’s Monitoring Plan in the registered PDD version 03 dated 16/02/2015" in the verification opinion of the verification report. However, the DOE also submitted the post-registration which includes the revised PDD version 04 dated 05/09/2022. The DOE is required to substantiate how it verified the implementation and the monitoring of project activity as per the revised PDD.
1:
The DOE (p 7) states that "Under section A.2 of the PRC PDD, geo-coordinates of each WTGs are provided and same are found correct." The DOE is required to provide further information on how it validated the correctness of newly incorporated geo-coordinates of each WTGs in the revised PDD since there was no evidence/information on how it validated.
2:
The DOE states that "justification of non-calibration of WTG controller found appropriate and same was confirmed with service provider during verification remote audit & interviews for PRC validation." The DOE is required to provide further information on how it validated the calibration of WTG controller since there no evidence on checking it with the manufacturer.
3:
Both the monitoring report (section B.2) and the verification report states that there was no PRC. However, the PRC was submitted along with this request for issuance. The PP/DOE is required to update the monitoring report and the verification report.
4:
The PP shall provide the monitoring line diagram (graphical scheme) showing all relevant monitoring points (including the controller data indicated in the submitted emission reduction spreadsheet) as per the PS-PA ver. 03 paragraph 258 taking into account that the verification report (Section E.6.2) indicates that the parameter “Quantity of net electricity generation supplied by the project plant/unit” is measured based on certificate of share.
5:
The DOE (p 15) states that "The net electricity generated by the project activity is taken directly from the joint metering report (JMR) issued by state utility on monthly basis." The DOE is required to provide its verification on the emission reduction spreadsheet (“Apportioning”) as per the revised PDD submitted along with the request for issuance.
6:
The DOE states that "The management of Clean Wind Power (Devgarh) Private Limited is responsible for the preparation of the GHG emissions data and the reported GHG emissions reductions on the basis set out within the project’s Monitoring Plan in the registered PDD version 03 dated 16/02/2015" in the verification opinion of the verification report. However, the DOE also submitted the post-registration which includes the revised PDD version 04 dated 05/09/2022. The DOE is required to substantiate how it verified the implementation and the monitoring of project activity as per the revised PDD.