03:31 03 Jun 25
Info Report Check
Submission incomplete:
Paragraph 369 of VVS-PA:
The calibration of cluster meters was not done at the frequency required by the monitoring plan, and the meters have not been calibrated until the date of the end of the monitoring period. As this is a deviation from the monitoring plan, the DOE is requested to explain why post registration change is not requested to address this deviation.
Paragraph 369 of VVS-PA:
The calibration of cluster meters was not done at the frequency required by the monitoring plan, and the meters have not been calibrated until the date of the end of the monitoring period. As this is a deviation from the monitoring plan, the DOE is requested to explain why post registration change is not requested to address this deviation.
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: