Scope: The verification report does not list each parameter required by the monitoring plan and does not provide an statement on how the DOE verified the information flow (from data generation, aggregation, to recording, calculation and reporting) for these parameters including the values in the monitoring reports (VVS v2, para 236, 284 (e)).
Issue: For parameter n (Identification of the power plants for the OM), the MR on page 12 make reference to files: “Operating Margin_LVLH_2010” and “Operating Margin_LVLH_2011”. However, the files do not contain information of the power plants for the OM. They also contain links to external files, without which the determination of the set of power plants (n) in the top 10%
of grid system dispatch order during hour h cannot be verified.