Info Report Check
Submission incomplete:
The DOE has cross-checked the data for the parameter “Quantity of net electricity supplied to the grid as a result of the implementation of the CDM project activity in year y” (EGBL,y) with the project site records (data extracted from the SCADA system). The DOE is requested to demonstrate, by comparing the electricity-generation figures reported in the project site records (data extracted from the SCADA system) with the corresponding figures in the record of the sold electricity (required by the applied methodology(ies)) for the monitoring period, that the proposed cross-checking approach is not likely to lead to a reduction in the accuracy of the calculation of GHG emission reductions.