Submission incomplete:
Scope: The verification report does not state that the monitoring has been carried out in accordance with registered or the accepted revised monitoring plan. (VVM v.1.2 para 206 & 221(d))
Issue: The monitoring plan requires that "The delivered Energy (wh) at ex- bus is metered by energy meters installed on 132 KV side of generator transformer by project proponent". The DOE is required to provide further explanation on how the monitoring has complied with the monitoring plan, given the parameter is now measured by the ABT meters (which according to the PDD page 55 are provided by STU/GETCO, and according to the verification report page 31 are also called SLDC ABT meters). Furthermore, the DOE is required to explain why a Post Registration Changes request was not made in accordance with the CDM Project Cycle Procedure version 2 paragraph 130(b).