Submission incomplete:
1: Scope: The spreadsheet does not contain all parameters required to be monitored and/or reported at the intervals required by the monitoring plan and the applied methodology.
The DOE is requested to validate the electricity generation by Santa Edwiges I and III.

2: Scope: The verification report does not provide an assessment on whether the calibration of measuring equipment was conducted at a frequency specified in the applied monitoring methodology, EB guidance, and/or the monitoring plan (VVM v.1.2 para 184 (a) (ii) & EB 52 Annex 60).
The DOE is requested to validate the calibration of all electricity meters. Specifically, calibration details for the principle and back up meters for Santa Edwiges I SHPP and Santa Edwiges III SHPP are missing.

3: Scope: The verification report does not provide an assessment of the compliance with EB 52 Annex 60 'Guidelines for assessing compliance with the calibration frequency requirements' for the calibration delay. (VVM v.1.2 para 184 (a) (ii) & EB 52 Annex 60)
The DOE is requested to clarify whether the error has been applied for all the measured values taken during the period between the scheduled date of calibration and the actual date of calibration (for the calculation of baseline emissions). The submission only refers to whole months rather than exact dates.
In addition, the DOE is requested to clarify whether the error was applied in a conservative manner such that the adjusted values resulted in higher project emissions.