Submission incomplete:
1: Scope: The verification report does not contain information on all CARs, CLs and FARs and/or provide an assessment and close out of any CARs, CLs or FARs issued. (VVM v.1.2 para 192, 194)
Issue:
The DOE shall clarify whether the Social Management Report issued on 30/03/2010 covering the period from 28/05/2008 to 30/03/2010 was verified or not to close FAR 01 raised in the previous monitoring period.

2: Scope: The verification report does not provide an assessment on whether the calibration of measuring equipments was conducted at a frequency specified in applied monitoring methodology or EB guidance if applicable, and/or the monitoring plan? (VVM v.1.2 para 184 (a) (ii) & EB 52 Annex 60)
Issue:
1. The DOE shall report the calibration frequency of the energy meter, validity of the calibration tests performed by the calibration agency and conclude whether the calibration will cover the whole monitoring period in line with para 184 (ii) of VVM version 1.2. In doing so, the DOE shall clarify:
a). Mismatch in serial numbers of the energy meters mentioned in the MR and verification report as compared to the verification report of previous monitoring period.
b). Mismatch in second calibration date as mentioned in MR and verification report for the meters ION 8300 PS-0511A080-01, ION 8300 PS-0511A081-01, ION 8300 PS-0511A082-01 and ION 8300 PS-0511A083-01

2. Further, the DOE shall clarify which are main and/or back up meters out of six meters listed in the verification report (pg 17 and 18) and their application with regards to the measurement of net electricity supplied to the grid.