21:39 25 Dec 24
Info Report Check
Submission incomplete:
Scope: The verification report does not provide an assessment of the compliance with EB 52 Annex 60 'Guidelines for assessing compliance with the calibration frequency requirements' for the calibration delay. (VVM v.1.2 para 184 (a) (ii) & EB 52 Annex 60)
Issue:
The DOE has not provided information regarding how it validated the maximum permissible error of the flow meter to engines (SN ending in 5375) applied to the calibration gap. In particular, the DOE has not provided information regarding which is the "full scale" for which the 0.5% error applies (including details on the temporal basis e.g. hourly/daily/etc. in which it should be applied).
Scope: The verification report does not provide an assessment of the compliance with EB 52 Annex 60 'Guidelines for assessing compliance with the calibration frequency requirements' for the calibration delay. (VVM v.1.2 para 184 (a) (ii) & EB 52 Annex 60)
Issue:
The DOE has not provided information regarding how it validated the maximum permissible error of the flow meter to engines (SN ending in 5375) applied to the calibration gap. In particular, the DOE has not provided information regarding which is the "full scale" for which the 0.5% error applies (including details on the temporal basis e.g. hourly/daily/etc. in which it should be applied).
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: