Info Report Check
Submission incomplete:
Scope: The monitoring report does not contain the implementation status of the project (including a brief description of the installed technology and/or equipments, relevant dates of project activity e.g. date of construction, commissioning, continued operation periods, etc.) during the monitoring period under consideration. (PS v1 para 188 (a)(b)(c))
Issue:The name of the substation shown in the PDD page 34 is Dayao, which is inconsistent with the substation name"Zixi" shown in the MR. The DOE/PP is requested to clarify which substation the project connects with.
Scope: The monitoring report does not contain the implementation status of the project (including a brief description of the installed technology and/or equipments, relevant dates of project activity e.g. date of construction, commissioning, continued operation periods, etc.) during the monitoring period under consideration. (PS v1 para 188 (a)(b)(c))
Issue:The name of the substation shown in the PDD page 34 is Dayao, which is inconsistent with the substation name"Zixi" shown in the MR. The DOE/PP is requested to clarify which substation the project connects with.
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: