Submission incomplete:
1: Scope: The monitoring report does not contain calculations of baseline emissions, project emissions, leakage (if any), and/or emission reductions, including reference to formulae and methods used. (EB48 - Annex 68 paragraph 10 (a) (vii))
Issue: a formula is used to determine the transmission losses, based on the electricity generated, generation hours, line to line voltage of the transmission line, electrical resistance of the transmission line and the power factor of the generator. However, the sources of the electrical resistance and the line to line voltage of the transmission line were not provided.

2: Scope: The spreadsheet does not contain explanation with regard to application of formulae in the spreadsheet. (EB48 - Annex 68 paragraph 10 (b) (iii)).
Issue: Proper explanation on the source of values used to determine the transmission losses were not provided.

3: Scope: The verification report does not determine if the assumptions used in emission calculations have been justified and/or emission factors, default values and other reference values have been correctly applied. (VVM v.1.2 para 208 (d) & (e))
Issue: In the calculation of tranmission losses from the Cengong Sandengkan Project, the DOE justifies that the values of R and UL applied were based on the the previous monitoring period and according to the revised monitoring plan. However, the DOE should have justified these values based on relevant documents from the project (such as technical specifications from supplier of the line and from the project desing, for example), as neither those documents make reference of the sources.