09:01 27 Dec 24
Info Report Check
Submission incomplete:
VVS-PA Para 339:
As per Para 339 of VVS-PA, version 02.0, it is mandatory for the DOE to conduct an on-site inspection at verification for the registered CDM project activity if it is the first verification for the DOE with regard to the project activity. This is the first verification by the DOE and the DOE did not conduct site visit. The DOE shall therefore provide a proper justification as to why the site visits cannot be postponed, including the demonstration of a significant impact of delaying the site visits on the DOE or PP as per requirements of Para 26 (b) of EB106 meeting report.
VVS-PA Para 339:
As per Para 339 of VVS-PA, version 02.0, it is mandatory for the DOE to conduct an on-site inspection at verification for the registered CDM project activity if it is the first verification for the DOE with regard to the project activity. This is the first verification by the DOE and the DOE did not conduct site visit. The DOE shall therefore provide a proper justification as to why the site visits cannot be postponed, including the demonstration of a significant impact of delaying the site visits on the DOE or PP as per requirements of Para 26 (b) of EB106 meeting report.
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: