Info Report Check
Submission incomplete:
Scope: The monitoring report does not contain the values of the monitored parameters used to calculate baseline, project and leakage emissions as well as other parameters required by the applied methodology and the registered monitoring plan as per PS version 09.0 paragraphs 247 and 248 (a) (c) (d) (e) (f).

There appears to be a transposition error in table E.1.1 and E.1.2. While the aggregate data in the tables is the same as the CER spreadsheet, the generation data for individual months do not match the spreadsheet nor the description in the MR (e.g. generation began 5 Sep 2014 and there was no generation during the dry period in 2015, whereas table E.1.1 and E.1.2 of the MR indicates that the project also generated electricity during May to August 2014).