Submission incomplete:
1: The DOE shall determine whether there are permanent changes
to the registered monitoring plan and, if there are, determine whether the permanent changes comply with the relevant requirements in the “CDM project standard for project activities”. Please refer to VVS PA v1.0 paragraph 296-299.
The PRC request and the revised PDD indicate the change to the monitoring plan. However, the DOE has not validated the proposed permanent changes to the registered monitoring plan.

2: Where there are changes to the project design of a registered CDM project activity, the project participants shall prepare a revised PDD
that describes the nature and extent of the proposed or actual changes. Please refer to PS PA v1.0 paragraph 241.
In page 8 of the validation opinion, the DOE has stated that: "The estimated lost carbon stock removal due to that is about 178.05 tCO2e per year". This is not reflected in the ex ante calculation in the revised PDD.