Info Report Check
Submission incomplete:
Scope: The monitoring report does not contain a description of the monitoring systems, quality assurance and/or quality control system employed by the project activity, data collection procedures (information flow including data generation, aggregation, recording, calculation and reporting), organizational structure, roles and responsibilities of personnel, emergency procedures for the monitoring system, and/or line diagrams showing all relevant monitoring points). (EB48 - Annex 68 paragraph 10 (a) (ii) & EB 54 Annex 34).
Issue: The DOE is requested to clarify the inconsistencies in: i) Gauze composition during the project campaigns, GC_project, as the MR (Annex 2) indicates that the gauze composition was different during the project and baseline campaigns while the verification report (Table 1; parameter 5) mentions that the "composition kept same as in last monitoring period" and does not report any changes in the gauze composition; ii) NAP monitoring equipment as the MR (Annex 3) indicates an accuracy level of ± 0.27% while the verification report (Table 1) shows an accuracy level of ± 0.24%.