Submission incomplete:
1: The PP shall provide the monitoring line diagram (graphical scheme) showing all relevant monitoring points (including the controller data indicated in the submitted emission reduction spreadsheet) as per the PS-PA ver. 03 paragraph 258 taking into account that the verification report (Section E.6.2) indicates that the parameter “Quantity of net electricity generation supplied by the project plant/unit” is measured based on certificate of share.
2: The submitted emission reduction spreadsheet (“Emission reduction”, cell E5) indicates “Net Electricity (KWh) as per the JMR (Gujarat Share Certificate)” while the monitoring report and the verification report state that project activity is located in the State of Rajasthan. Please provide the clarification on the different State (Gujarat) referred in the spreadsheet.
3: The submitted emission reduction spreadsheet (“Apportioning”) provides values for the controller data. The PP/DOE shall clarify how the quantity of net electricity generation supplied by the project plant/unit to the grid (EGfacility,y) was monitored considering that i) the registered monitoring plan shows that EGfacility,y is monitored by the main meter and the check meter installed at the substation and ii) the monitoring plan does not refer to the monitoring of electricity exported and imported by the controller.
1: The PP shall provide the monitoring line diagram (graphical scheme) showing all relevant monitoring points (including the controller data indicated in the submitted emission reduction spreadsheet) as per the PS-PA ver. 03 paragraph 258 taking into account that the verification report (Section E.6.2) indicates that the parameter “Quantity of net electricity generation supplied by the project plant/unit” is measured based on certificate of share.
2: The submitted emission reduction spreadsheet (“Emission reduction”, cell E5) indicates “Net Electricity (KWh) as per the JMR (Gujarat Share Certificate)” while the monitoring report and the verification report state that project activity is located in the State of Rajasthan. Please provide the clarification on the different State (Gujarat) referred in the spreadsheet.
3: The submitted emission reduction spreadsheet (“Apportioning”) provides values for the controller data. The PP/DOE shall clarify how the quantity of net electricity generation supplied by the project plant/unit to the grid (EGfacility,y) was monitored considering that i) the registered monitoring plan shows that EGfacility,y is monitored by the main meter and the check meter installed at the substation and ii) the monitoring plan does not refer to the monitoring of electricity exported and imported by the controller.