Info Report Check
Submission incomplete:
The DOE is required to provide the information on the global stakeholder consultation conducted after the publication of the first monitoring report (paragraph 394-395 of VVS for PA version 2).
The DOE (p19) states that " to perform the 1st periodical verification of the “20 MW BEL Wind Power Project in Maharashtra” (UN reference number: 10066). However, it did not provide any information as per paragraph 394-395 of VVS for PA version 2 since E.10. Global stakeholder consultation in the verification report (p 18) states "Not applicable for the present monitoring period".
The DOE is required to provide the information on the global stakeholder consultation conducted after the publication of the first monitoring report (paragraph 394-395 of VVS for PA version 2).
The DOE (p19) states that " to perform the 1st periodical verification of the “20 MW BEL Wind Power Project in Maharashtra” (UN reference number: 10066). However, it did not provide any information as per paragraph 394-395 of VVS for PA version 2 since E.10. Global stakeholder consultation in the verification report (p 18) states "Not applicable for the present monitoring period".
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: