Info Report Check
Submission incomplete:
1: Scope: The spreadsheet does not contain the formulae of calculation that are shown in the spreadsheet cells whenever possible. (EB48 - Annex 68 paragraph 10 (b) (ii)).
Issue: the spreadsheet does not contain the calculation of the electricity consumed by the project during the period 9 September 2009 - 23 January 2010, when the electricity meter was not installed.

2: Scope: The verification report does not describe the implementation status of the project. (For project activities that consist of more than one site, the report shall clearly describe the status of implementation and starting date of operation for each site. For CDM project activities with phased implementation, the report shall state the progress of the proposed CDM project activity achieved in each phase under verification). (VVM v.1.2 para 198 (a)).
Issue: the Verification Report states in section 3.3 that "only one biogas engine has been used to generate electricity from methane recovered for a total of 159 days throughout the monitoring period", which is inconsistent with the information provided in the spreadsheet where electricity generation is reported for both Genset A and Genset B for 337 days and 338 days respectively during the monitoring period. Additional information is requested to clarify the inconsistency.

3: Scope: The verification report does not list each parameter required by the monitoring plan (VVM v.1.2 para 206)
Issue: the Verification Report does not contain information on how the DOE has verified all electrical equipment (and corresponding capacity) needed to conservatively calculate the electricity consumption by the project for the period 9 September 2009 - 23 January 2010.