Submission incomplete:
1: Scope: The monitoring report does not contain the implementation status of the project (including a brief description of the installed technology and/or equipments, relevant dates of project activity e.g. date of construction, commissioning, continued operation periods, etc.) during the monitoring period under consideration. (EB48 - Annex 68 paragraph 10 (a) (i) & EB 54 Annex 34).
Issue:
The PP is requested to provide information about AMS downtime during baseline campaign and if there was AMS downtime, how it was handled as per AM0034 requirements.
2: Scope: The monitoring report does not contain information on calibration of monitoring instruments (frequency, relevant dates of calibration and/or validity) as specified by the monitoring methodology and the monitoring plan. (EB48 - Annex 68 paragraph 10 (a) (iv) & EB 54 Annex 34)
Issue:
The monitoring report (Annex 3, page 1 and 2) state that QAL2 test is valid until 2011 whereas it is also stated in Annex 3, page 3 that this test is valid until 2013. The PP is requested to clarify this inconsistency.
The PP is also requested to provide the exact dates of the QAL2 test.
3: Scope: The verification report does not provide an assessment on whether the calibration of measuring equipments was conducted at a frequency specified in applied monitoring methodology or EB guidance if applicable, and/or the monitoring plan? (VVM v.1.2 para 184 (a) (ii) & EB 52 Annex 60)
Issue:
The verification report (page 25) states that the QAL2 test is valid until 2011 whereas it is also stated page C-4 that the same QAL2 test is valid until 2013. The DOE is requested to clarify this inconsistency.
4: Scope: The verification report does not provide an assessment of the compliance with EB 52 Annex 60 'Guidelines for assessing compliance with the calibration frequency requirements' for the calibration delay. (VVM v.1.2 para 184 (a) (ii) & EB 52 Annex 60)
Issue:
The monitoring report and the verification reports state that the baseline campaign was carried out from 05.07.07 to 06.11.07 but that the QAL2 test lasted from 07.02.2008 to 13.02.2008. Information related to the dates and result of the QAL2 test under EN14181 that is relevant to the baseline campaign should be reported.
1: Scope: The monitoring report does not contain the implementation status of the project (including a brief description of the installed technology and/or equipments, relevant dates of project activity e.g. date of construction, commissioning, continued operation periods, etc.) during the monitoring period under consideration. (EB48 - Annex 68 paragraph 10 (a) (i) & EB 54 Annex 34).
Issue:
The PP is requested to provide information about AMS downtime during baseline campaign and if there was AMS downtime, how it was handled as per AM0034 requirements.
2: Scope: The monitoring report does not contain information on calibration of monitoring instruments (frequency, relevant dates of calibration and/or validity) as specified by the monitoring methodology and the monitoring plan. (EB48 - Annex 68 paragraph 10 (a) (iv) & EB 54 Annex 34)
Issue:
The monitoring report (Annex 3, page 1 and 2) state that QAL2 test is valid until 2011 whereas it is also stated in Annex 3, page 3 that this test is valid until 2013. The PP is requested to clarify this inconsistency.
The PP is also requested to provide the exact dates of the QAL2 test.
3: Scope: The verification report does not provide an assessment on whether the calibration of measuring equipments was conducted at a frequency specified in applied monitoring methodology or EB guidance if applicable, and/or the monitoring plan? (VVM v.1.2 para 184 (a) (ii) & EB 52 Annex 60)
Issue:
The verification report (page 25) states that the QAL2 test is valid until 2011 whereas it is also stated page C-4 that the same QAL2 test is valid until 2013. The DOE is requested to clarify this inconsistency.
4: Scope: The verification report does not provide an assessment of the compliance with EB 52 Annex 60 'Guidelines for assessing compliance with the calibration frequency requirements' for the calibration delay. (VVM v.1.2 para 184 (a) (ii) & EB 52 Annex 60)
Issue:
The monitoring report and the verification reports state that the baseline campaign was carried out from 05.07.07 to 06.11.07 but that the QAL2 test lasted from 07.02.2008 to 13.02.2008. Information related to the dates and result of the QAL2 test under EN14181 that is relevant to the baseline campaign should be reported.