Submission incomplete:
Scope: The verification report does not describe the implementation status of the project. (For project activities that consist of more than one site, the report shall clearly describe the status of implementation and starting date of operation for each site. For CDM project activities with phased implementation, the report shall state the progress of the proposed CDM project activity achieved in each phase under verification). (VVS v2, para 228 (a))
Scope: The verification report does not describe the reasons for the phased-implementation delay and/or does not present the expected implementation dates. (VVS v2, para 228 (a))
Issue:The DOE is required to provide further details on how it has verified the implementation being consistent with the revised PDD, as page 2 and 6 of the revised PDD states that the lengths of the transmission line are 4.5 km (from lower plant to upper plant) and 3.4 km (from upper plant to DakNong Station), whereas the Monitoring report page 7 and the Verification report page 11 state that the lengths are 4.668 km (from lower to upper powerhouse) and 3.269 km (from upper Powerhouse to Dak Nong Station).