Submission incomplete:
The project technical parameters i.e. the installed capacity of one power plant is changed from 8.01 MW to 8.1 MW as validated in the PRC submitted along with the issuance request. The DOE considered this change as correction referring to paragraph 241(a) of PS for PA version 2. The DOE shall provide further information how it considered the change as correction and not a change in project design.
The project technical parameters i.e. the installed capacity of one power plant is changed from 8.01 MW to 8.1 MW as validated in the PRC submitted along with the issuance request. The DOE considered this change as correction referring to paragraph 241(a) of PS for PA version 2. The DOE shall provide further information how it considered the change as correction and not a change in project design.