Submission incomplete:
Scope: The DOE shall determine whether the monitoring of parameters related to the GHG emissions reductions in the project activity has been implemented in accordance with the monitoring plan contained in the registered PDD or any accepted revised monitoring plan. (VVS v7, para. 278).
"The applied methodology ACM0002 version 8 requires that the monitoring parameter “APJ” (Area of the reservoir measured in) the surface of the water, after the implementation of the project activity, when the reservoir is full) shall be yearly measured from topographical surveys, maps, satellite pictures, etc, after the implementation of the project activity, when the reservoir is full. However, the monitoring report (p 10) and verification report (p 38) state that "the value of this monitoring parameter was obtained as per the drawing of the reservoir and there has not been any change since the implementation of the project in the reservoir area". Further, it is observed that the applied value is the same as the value presented in the registered PDD which states that project was under construction (p 1 and 41). Further information is required on how the DOE verified the monitoring parameter “APJ” in line with the applied methodology."
Scope: The DOE shall determine whether the monitoring of parameters related to the GHG emissions reductions in the project activity has been implemented in accordance with the monitoring plan contained in the registered PDD or any accepted revised monitoring plan. (VVS v7, para. 278).
"The applied methodology ACM0002 version 8 requires that the monitoring parameter “APJ” (Area of the reservoir measured in) the surface of the water, after the implementation of the project activity, when the reservoir is full) shall be yearly measured from topographical surveys, maps, satellite pictures, etc, after the implementation of the project activity, when the reservoir is full. However, the monitoring report (p 10) and verification report (p 38) state that "the value of this monitoring parameter was obtained as per the drawing of the reservoir and there has not been any change since the implementation of the project in the reservoir area". Further, it is observed that the applied value is the same as the value presented in the registered PDD which states that project was under construction (p 1 and 41). Further information is required on how the DOE verified the monitoring parameter “APJ” in line with the applied methodology."
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: