Submission incomplete:
1: Scope: The verification report does not list each parameter required by the monitoring plan (VVM v.1.2 para 206)
Issue: The monitoring plan (p. 37) requires "Hourly meter readings of the power generated shall be recorded in a log book", however only daily recordings have been referred in the verification report.

2: Scope: The verification report does not provide an assessment on whether the calibration of measuring equipments was conducted at a frequency specified in applied monitoring methodology or EB guidance if applicable, and/or the monitoring plan? (VVM v.1.2 para 184 (a) (ii) & EB 52 Annex 60)
Issue: Errors due to calibration delay for meters including HPB 00259&260 and HPB 00261&262 have been calculated based on 1 year calibration frequence. However there is discrepancy on the calibration frequency of net electricity meter: in the PDD it is every 6 months (p. 19) and in the verification report (including p.43) is 1 year.