Info Report Check
Submission incomplete:
Scope: The verification report does not state that the monitoring has been carried out in accordance with registered or the accepted revised monitoring plan. (VVM v.1.2 para 206 & 221(d))
Issue: The revised monitoring plan Section D.4. states that the "Accuracy of the flow meters utilized exceeds 99 percent across the entire measured rate curve with an uncertainty range of less than + 1 percent" and regarding the methane gas analyzer, that "The equipment and test procedures will provide an accuracy with a + 1⁄2 percent uncertainty range". However, the verification report does not indicate if this has been complied with.