Submission incomplete:
1: Scope: The revised PDD does not contain a description of the corrections to project information and specify how it is in accordance with Appendix 1 of the Project Standard (PS v1, para 209)
Issue: PP shall specify that the changes made to the revised PDD are in accordance with Appendix 1 of the Project Standard.
2: Scope: The validation opinion does not contain a confirmation that the changes do not require prior approval of the Board and the provisions of Appendix 1 of Project Standard apply to those corrections. (VVS v2 para 248).
Issue: DOE shall provide a validation opnion of the corrections made in the revised PDD about the CO2 emission factor for the fossil fuel fired in the power plant used prior to the start of the implementation of the project activity and Net calorific value of fossil fuel fired in the power plant used prior to the start of the implementation of the project activity. DOE shall confirm that corrections made in the revised PDD do not require prior approval of the Board.
3: Scope: The DOE shall determine whether the monitoring of parameters related to the GHG emissions reductions in the project activity has been implemented in accordance with the monitoring plan contained in the registered PDD or any accepted revised monitoring plan. (VVS v2 para 233)
Issue: DOE shall further evidence that the Quantity of heat extracted from all heat only/peak load boilers, has been monitored in accordance with the monitoring plan and applied methodology.
1: Scope: The revised PDD does not contain a description of the corrections to project information and specify how it is in accordance with Appendix 1 of the Project Standard (PS v1, para 209)
Issue: PP shall specify that the changes made to the revised PDD are in accordance with Appendix 1 of the Project Standard.
2: Scope: The validation opinion does not contain a confirmation that the changes do not require prior approval of the Board and the provisions of Appendix 1 of Project Standard apply to those corrections. (VVS v2 para 248).
Issue: DOE shall provide a validation opnion of the corrections made in the revised PDD about the CO2 emission factor for the fossil fuel fired in the power plant used prior to the start of the implementation of the project activity and Net calorific value of fossil fuel fired in the power plant used prior to the start of the implementation of the project activity. DOE shall confirm that corrections made in the revised PDD do not require prior approval of the Board.
3: Scope: The DOE shall determine whether the monitoring of parameters related to the GHG emissions reductions in the project activity has been implemented in accordance with the monitoring plan contained in the registered PDD or any accepted revised monitoring plan. (VVS v2 para 233)
Issue: DOE shall further evidence that the Quantity of heat extracted from all heat only/peak load boilers, has been monitored in accordance with the monitoring plan and applied methodology.