Info Report Check
Submission incomplete:
1: VVS-PA Para 365:
As per the ER spreadsheet, apportioning is done for the month of July 2017. It is understood that the generation from 17/07/2017 to 31/07/2017 considered is taken from the controller meter data. However, the calibration details of the controller meters have not been provided in the monitoring report. The DOE is therefore requested to provide information on calibration of the controller meters.

2: VVS-PA Para 373(b):
As shown in the ER spreadsheet, for Suzlon site, net electricity values from the credit notes are used for calculation of the emission reductions. However, it is observed that for some months (example: July 2017), invoice values are lower than the net export values based on credit notes. The DOE is therefore requested to explain how it verified parameter EG facility, y (Quantity of net electricity generation that is produced and fed into the grid) for this site in light of the invoice values being lower than the JMR values.